Missed opportunity: Lancaster signs 2-yr contract for electric supply; higher rate and minimum percentage from renewable sources.

Adobe Firefly AI: "Smokestacks against a gray sky" An update to Lancaster's page on the Colonial Power website shows that Lancaster's electric aggregation program has contracted for a rate of 15.1 cents per kWh for two years, beginning this December. The supply contract includes the state-minimum 57% energy from renewable sources. Harvard recently announced it's own 2-year contract, offering a lower rate with 100% from renewable sources.